This map displays planned infrastructure projects across the Suffolk County Water Authority service territory. To see if construction is scheduled near your home, expand the map or enter your address in the search bar.

info
Planned Infrastructure Work vs. Emergency Repairs All projects displayed on this map are scheduled capital improvements conducted in addition to emergency water main break repairs. If you are experiencing low water pressure or a service outage right now, view our Real-Time Main Breaks Map.

Types of Capital Projects

SCWA upgrades its distribution system year-round to maintain water quality, support fire protection, and improve reliability. Select a project category below to view the stages of construction:

Project Phases

1

Water Main Installation

Crews excavate the trench, lay the new ductile iron main alongside the existing pipe, and backfill the roadway.

2

Chlorination & Testing

The new main is disinfected, flushed, and tested in SCWA’s laboratory to verify water quality before activation.

3

Service Taps

Individual customer service lines and fire hydrants are transferred from the old pipe to the newly approved water main.

4

Final Restoration

Once the old main is retired and all connections are complete, crews permanently pave and restore the roadway and curb areas.

Project Phases

1

Water Main Installation

Crews excavate along the right-of-way and install new water main segments and fire hydrants.

2

Chlorination & Testing

The newly installed pipeline is pressurized, chlorinated, flushed, and sampled to meet strict health standards.

3

Service Taps

Crews tap the new main to install service connections and meter pits for properties connecting to SCWA’s system.

4

Final Restoration

Trenches, road surfaces, and disturbed right-of-way areas are permanently paved and restored.

Project Phases

1

Water Main Installation

Crews install connecting mains, valves, and pressure-regulating equipment to link distribution zones.

2

Chlorination & Testing

All new piping undergoes pressure testing, disinfection, and laboratory water quality verification.

3

Service Taps

Any affected customer service lines or hydrants along the route are connected to the upgraded main.

4

Final Restoration

Roadways and work zones are permanently repaved and restored once the system upgrades are online.